Europoltech 2011
Europoltech 2009
Exhibitors 2009SupermodernEuropoltech 2007Exhibitors 2007ContactsLinks

Electrical service, water supply and drainage

Electricity and Water

 

 

Electrical service connection including flat rate consumption fee - Exhibitor’s booth in exhibition hall

Power output

Price €

0.1 kW - 2.0 kW (1 phase)

35.00 + VAT

2,1 kW - 3.0 kW  (3 phase)

40.00 + VAT

3,1 kW - 5,0 kW  (3 phase)

50.00 + VAT

5,1 kW - 9,0 kW  (3 phase)

80.00 + VAT

24-hour refrigerator power supply, 2 kW

55.00 + VAT

 

 

Electrical service connection including flat rate consumption fee - Exhibitor’s booth in open sector

Power output

Price €

0,1 kW - 2,0 kW ( I phase)

45.00 + VAT

2,1 kW - 3.0 kW ( III phase)

50.00 + VAT

3,1 kW - 5,0 kW ( III phase)

60.00 + VAT

5,1 kW - 9,0 kW ( III phase)

90.00 + VAT

24-hour refrigerator power supply, 2 kW

65.00 + VAT

Electrical service orders for more than 9 kW to be agreed individually.

 

 

Water supply and drainage in exhibition hall

 

Price €

Water supply incl. drainage

110,00 + VAT

 

 

 

Water supply and drainage fee in open sector

 

Price €

Water supply incl. drainage

130,00 + VAT

 

 

If a custom stand is constructed in either an exhibition hall or the open sector, the Exhibitor is obliged to agree on the design of the wiring system with the General Shell Scheme Contractor and to receive a written approval of this design from the Contractor.

Power connection and anti-shock measurements are performed by the General Shell Scheme Contractor.

 

 

 



printable version...




Międzynarodowe Targi Gdańskie SA
Europoltech 2011
Europoltech 2009
Exhibitors 2009SupermodernEuropoltech 2007Exhibitors 2007ContactsLinks

© 2006-2010 Międzynarodowe Targi Gdańskie SA teLMi design